2004 PG&E KETTLEMAN DECOMMISSIONING - This project consisted of removing all of the old gas plant including a training facility which housed workers and included a mess hall, swimming pool, tennis and basketball courts and various other buildings. Hazardous materials included hexavalent chromium as an anti-corrosive additive in the pipes, was the responsibility of PG&E regarding evacuation of the chemical. Abatement of asbestos and lead containing materials was conducted prior any demolition. Kroeker was able to salvage many pieces of equipment which consisted of motors, tanks, and the recycling of metal. Baserock was produced from the accumulation of concrete materials by running it through a portable rock crusher.

Site Best Viewed @ 1024x768 - Privacy Statement -  © Kroeker, Inc.  - Fresno, CA. 2005; all rights reserved - Site design by Jmaster