MILPITAS CONTAMINATED SOIL
REMOVAL - This job involved the removal of a structure
that manufactured tiles which consisted of a glazing that
contained lead. Through the years broken tiles and products
were disposed of on-site. Kroeker's contract involved the
removal of the structure and the removal of the contaminated
soil. The Health and Safety Plan called for Kroeker to
provide air monitoring and personnel monitoring to determine
the lead exposure.